Dashboard

Overview of your business performance

Total Income

$ 0.00

I

Total Expense

$ 0.00

E

Projects

1

P

Invoices

0

V

Income

Overview

Last 7 months
Jan Feb Mar Apr May Jun

Income

Recent Invoices

View all
There is no data to display!

Projects

Projects

View all
DO

Double-Wide Mobile Home Demolition & Site Cleanup

Due Date 08-31-2026

Started

<h2 xss=removed>Project Overview</h2><p class="isSelectedEnd" xss=removed>This project involves the <strong>complete demolition, dismantling, removal, hauling, and site cleanup of an existing double-wide manufactured/mobile home</strong> located at <strong>411 Harbor Dr., Ocean City, Maryland 21842</strong>.</p><p class="isSelectedEnd" xss=removed>The structure is an existing single-story double-wide mobile home with exterior vinyl siding, roofing, windows, doors, attached exterior improvements, utility components, landscaping features, and associated construction materials. Based on the existing site conditions, the demolition will require a controlled approach designed to protect neighboring properties and other improvements that are to remain.</p><p class="isSelectedEnd" xss=removed>The project is intended to leave the property <strong>clear, safe, clean, and ready for the owner's next phase of development or site preparation</strong>.</p><h2 xss=removed>Scope of Work</h2><p class="isSelectedEnd" xss=removed>The demolition project may include the following work, subject to the final contract, permits, utility requirements, and site conditions:</p><ul data-spread="true" xss=removed><li><strong>Pre-Demolition Preparation:</strong> Establish a safe work area, coordinate access for demolition equipment and containers, identify items that must remain, and verify required permits and utility disconnections before demolition begins.</li><li><strong>Utility Coordination:</strong> Confirm that electrical, water, sewer, gas/propane, telecommunications, HVAC connections, and other applicable services have been properly disconnected, capped, or otherwise made safe by the appropriate utility company or licensed contractor where required.</li><li><strong>Exterior Structure Removal:</strong> Demolish and remove the complete double-wide mobile home, including roofing materials, roof framing, exterior walls, vinyl siding, windows, exterior doors, insulation, structural framing, sheathing, trim, gutters/downspouts, and related building components.</li><li><strong>Interior Demolition:</strong> Remove interior walls, ceilings, flooring, cabinetry, fixtures, appliances if included in the contract, doors, insulation, plumbing components, and other interior materials associated with the structure.</li><li><strong>Deck, Porch, Steps & Railing Removal:</strong> Demolish and remove the existing wooden deck/porch structures, stairs, railings, posts, framing, decking boards, and associated materials where designated for removal.</li><li><strong>HVAC and Mechanical Removal:</strong> Remove the exterior HVAC equipment and associated components where included after all electrical and mechanical connections have been properly disconnected.</li><li><strong>Mobile Home Foundation/Support Removal:</strong> Remove accessible piers, blocks, anchors, tie-down components, skirting, support materials, and other manufactured-home foundation components included within the demolition scope.</li><li><strong>Debris Removal & Disposal:</strong> Load, separate where appropriate, haul, and legally dispose of demolition debris generated by the project. Materials may include lumber, roofing, siding, drywall, insulation, flooring, metal, glass, fixtures, and miscellaneous construction debris.</li><li><strong>Site Cleanup:</strong> Perform a final cleanup of the demolition area, removing loose debris, nails, wood, metal, glass, and other demolition-related materials. The site will be left in a reasonably clean and safe condition.</li></ul><h2 xss=removed>Site Considerations</h2><p class="isSelectedEnd" xss=removed>Because the mobile home is located within a developed waterfront residential environment with <strong>neighboring structures, walkways, landscaping, utilities, and limited working space</strong>, demolition operations should be carefully controlled.</p><p class="isSelectedEnd" xss=removed>Special consideration should be given to equipment positioning, debris containment, truck and dumpster access, protection of neighboring property, underground and overhead utilities, and maintaining safe access around the work area.</p><p class="isSelectedEnd" xss=removed>Any existing improvements that are specifically designated to remain will be protected to the extent reasonably practical during demolition operations.</p><h2 xss=removed>Permits, Environmental & Safety Requirements</h2><p class="isSelectedEnd" xss=removed>Demolition will be performed in accordance with applicable <strong>Ocean City, Worcester County, Maryland, and other governing requirements</strong>.</p><p class="isSelectedEnd" xss=removed>Before structural demolition begins, required permits and utility clearances should be obtained. Any required inspections or testing for regulated materials—such as <strong>asbestos-containing materials, lead-based paint, refrigerants, fuel/propane, or other hazardous or regulated materials</strong>—will be addressed in accordance with applicable requirements.</p><p class="isSelectedEnd" xss=removed>Discovery of previously unidentified hazardous materials, underground structures, tanks, concealed utilities, contaminated materials, or other unforeseen conditions may require additional evaluation and work outside the original demolition scope.</p><p class="isSelectedEnd" xss=removed><br></p><h2 xss=removed>Final Project Objective</h2><p class="isSelectedEnd" xss=removed>Upon completion, the existing double-wide mobile home and all demolition components included within the approved scope will be removed from <strong>411 Harbor Dr., Ocean City, MD 21842</strong>. All generated demolition debris will be hauled from the property and disposed of appropriately.</p><p xss=removed>The demolition area will receive a final cleanup and be left <strong>clear, safe, and prepared for subsequent grading, redevelopment, installation of another manufactured home, landscaping, or other future property improvements</strong>, subject to the owner's plans and applicable local requirements.</p>

Priority: High $ 12,000.00

Expense

Recent Expense

Total
There is no data to display!